Test item 测试名称:Sliding and Folding Door Hardware 滑动门和折叠门部件
Test info 测试内容:
Clause |
Test Requirement |
|
4.1 |
Static Load Test (Heavy Sliding Doors) |
|
4.2 |
Static Friction Test (Heavy Sliding Doors) |
|
4.3 |
Durability Test (Heavy Sliding Doors) |
|
4.4 |
Operation Test for Smoothness (Folding & Sliding Doors) |
|
4.5 |
Static Friction Test (Folding Doors) |
|
4.6 |
Kinetic Friction Test (Folding Doors) |
|
4.7 |
Durability Test (Bifold Doors) |
|
4.8 |
Ability to Maintain Adjustments Test |
|
4.9 |
Durability Test (Multiple Fold Doors) |
|
4.10 |
Static Friction Test (Sliding Doors) |
|
4.11 |
Kinetic Friction Test (Sliding Doors) |
|
4.12 |
Durability Test (Sliding Doors) |
|
4.13 |
Abuse Test (Folding and Sliding Doors) |
|
4.13.1 |
Jump Resistant Test |
|
4.13.2 |
Mirror Impact Test |
|
4.13.3 |
Bottom Track Crushing Test |
|
5.2 |
Salt Spray Test |
|
5.3 |
Perspiration Test |
|
Remark: For internal reference only, final quotation according to the type of product. |
||
说明 :内部使用, 最终报价视产品类型而定. |
||
Sample required: 4 sets of completed products with assembly instruction (if applicable). |
||
样品要求 :全套样品4套并包括安装说明书(如适用). |
||
Turnaround time: Regular (9~14 working days) |
||
所需时间: 标准(9~14 个工作天) |
Sample for reference 参考图片: