Test item 测试名称: | |
Water Closets Part1: Pans 坐便器第一部分:本体 | |
Test info 测试内容: | |
Clause | Test Requirement |
2 | Design 设计 |
2.1 | Water seal 水封高度 |
2.2 | Fixing and support 安装 |
3 | Performance requirements 操作要求 |
3.1 | Full-flush: Paper discharge test 全冲—手纸冲出测试 |
3.2 | Reduced-flush: Paper discharge test 小冲—手纸冲出测试 |
3.3 | Solid discharge test 固体冲落 |
3.4 | Leakage and capability test 泄漏与能力测试 |
3.5 | Splash test 飞溅测试 |
3.6 | Wetting Test 潮湿测试 |
3.7 | Load safety test 负载安全测试 |
3.8 | Reduced-flush liquid contaminant test 小冲液体污染测试 |
4 | Marking and labels 商标 |
Sampling Requirement: 2 sets of completed products with assembly instruction (if applicable) | |
样品要求: 全套样品2套并包含安装说明书(如适用) | |
Turnaround time: normal (9 working days); express(7 working days) | |
所需时间: 标准(9个工作日);加快(7个工作日) |
Sample for reference 参考图片: