Test item 测试名称: | |
Copper tubes for plumbing, gasfitting and drainage applications 应用于卫浴,气体装置以及排水装置的铜管 | |
Test info 测试内容: | |
Clause | Test Requirement |
2 | Material 材料 |
3 | Marking 商标 |
4 | Design 设计 |
4.1 | Freedom From Defect 欠点 |
4.2 | Temper and form of material 材料的韧度和形态 |
4.3 | Dimension and tolerance 尺寸及公差 |
5 | Performance and test method 性能和测试方法 |
5.1 | Contamination of water (AS/NZS 4020) 水污染 |
5.2 | Hardness test 硬度测试 |
5.3 | Internal surface quality 内部表面质量 |
5.4 | Watertightness 水密性 |
Sample required: 4 sets of completed products with assembly instruction (if applicable) . 样品要求 :全套样品4套并包括安装说明书(如适用) . |
|
Turnaround time: Normal (9 working days), Express (7 working days). 所需时间 :标准(9 个工作天), 加快(7 个工作天). |
Sample for reference 参考图片: