Test item 测试名称: Bicycles for young children 童车
Test info 测试内容:
4.2
|
Toxicity(each group)毒性测试(每组)
|
4.3
|
Sharp edges 利边
|
4.4
|
Security and strength of safety-related fasteners 安全紧固件强度测试
|
4.5
|
Crack detection methods 裂缝探测方法
|
4.6
|
Protrusions 突出物
|
4.7
|
Brakes 刹车
|
4.8
|
Steering 操纵系统
|
4.8.1
|
Handlebar - Dimensions and end fittings 尺寸及固定
|
4.8.2
|
Handlebar grips 车把手握把
|
4.8.3
|
Handlebar stem -insertion-depth mark or positive stop车把手立管插入深度标记
|
4.8.4
|
Steering stability 操纵稳定性
|
4.8.5
|
Steering assembly-Static strength and security tests 静态强度及牢固性
|
4.8.6
|
Handlebar and stem assembly - Fatigue test 把手及立管疲勞
|
4.9
|
Frame 车架
|
4.9.1
|
Impact test (Falling mass) 冲击测试(重物下落冲击)
|
4.9.2
|
Impact test (Falling frame) 冲击测试(车架下落冲击)
|
4.10
|
Front fork 前叉
|
4.10.1
|
General 一般要求
|
4.10.2
|
Front fork - bending fatigue test 弯曲疲劳测试
|
4.11
|
Wheels 轮子
|
4.11.1
|
Rotational accuracy 真圆度
|
4.11.2
|
Wheel/tyre assembly - Clearance 轮子间隙
|
4.11.3
|
Wheel/tyre assembly - Static strength test 轮子静态强度测试
|
4.11.4
|
Wheel retention 轮子保持力测试
|
4.12
|
Rims , Tyres and tubes 轮缘, 轮胎
|
4.13
|
Pedals and pedal/crank drive system 踏板和曲柄
|
4.13.1
|
Pedal tread 踏板面
|
4.13.2
|
Pedal clearance 踏板间隙
|
4.13.3
|
Pedal spindle - Impact test 踏板轴冲击
|
4.13.4
|
Pedal/pedal spindle - Dynamic durability test 踏板/踏板轴组件 -动态疲劳测试
|
4.13.5
|
Drive system - Static strenght test 传动系统强度
|
4.13.6
|
Crank assembly - Fatigue test 曲柄组疲劳测试
|
4.14
|
Saddles and seat-pillars 座垫和座垫轴
|
4.14.1
|
Limiting dimensions 尺寸
|
4.14.2
|
Seat pillar insertion-depth mark or positive stop 座垫轴插入深度记号
|
4.14.3
|
Saddle/seat pillar - Security test 座垫和座垫轴强度
|
4.14.4
|
Saddle - Static strength test 座垫轴静态强度
|
4.14.5
|
Seat pillar - Fatigue test 座垫轴疲劳测试
|
4.15
|
Chainguard 链条盖
|
4.16
|
Stabilizers辅助车轮
|
4.16.1
|
Mounting and dismounting安装于拆卸
|
4.16.2
|
Dimensions 尺寸
|
4.16.3
|
Vertical load test垂直载荷测试
|
4.16.4
|
Longitudinal load test纵向载荷测试
|
4.17
|
Luggage carriers 行李架
|
4.18
|
Lighting systems and reflectors照明系统及反射镜
|
5
|
Instructions 说明书
|
6
|
Marking 标签
|
Sample size 送样规格:
3sets of completed products, 2 pc of front fork, 2 pc of frame & fork assembly, 3 pcs of chain, 3 pc of handlebar and stem, 1 pc of saddle & saddle pillar assemble,1pc of saddle pillar 1pc of chainwheel and crank assembly,1pc of pedal.
全套样品3套,前叉2套,车架前叉组两件,传动链条3条,把手组3套,鞍座座杆组件1套,座杆1件,链盘曲柄组各一件,脚踏一件
Lead time 测试周期: 常规 Regular service 15 working days
Others 其他信息:
Sample report 报告样本: