Test item 测试名称: | |
Extruded Insulating Tubing 挤压成型绝缘管 | |
Test info 测试内容: | |
Test Clause | Requirement |
clause 6.9 Flame Test – All Tubing | |
clause 6.10 Optional VW-1 (Vertical Wire) Flame Test | |
conditioning | No designation |
Sample Required: | |
clause 6.9 | 6 m |
clause 6.10 | 6 m |
Turnaround time: normal (9 working days) | |
所需时间: 标准(9 个工作天) |